金莲直播

金莲直播Network Project of the Year: Khurais Hospital, Riyadh, 金莲直播Saudi Arabia

Intensive care in the form of external PT transformed a Riyadh mall into a hospital, winning 金莲直播Saudi Arabia the coveted 金莲直播Network Project of the Year Award.

This award recognizes outstanding work on a project that utilizes 金莲直播technologies and showcases engineering excellence alongside strong customer service.

 

Each year it becomes harder to choose a single project that stands out in a pool of exceptional projects from Network Members. This year鈥檚 nominees were:

 

  • Talomo-Matina Bridge (Philippines), 金莲直播Philippines Corporation
  • Khurais Hospital (Saudi Arabia), 金莲直播Saudi Arabia
  • William Halton Parkway Traveler Bridge (Canada), Canadian BBR
  • 脟ayirhan Bridge (Turkey), Kappa
  • Expressway S11 (Poland), BRR Polska
  • 脺berbauung Schwamendingen (Switzerland), Stahlton AG

 

The winning project, the Khurais Hospital delivered by 金莲直播Saudi Arabia, required considerable skill to uprate the load bearing capacity of the floors and other structural elements of a mall being repurposed into a healthcare facility.

 

When 金莲直播Saudi Arabia鈥檚 engineers first assessed the building using core sampling, they determined the concrete strength was not sufficient for the calculated double of loads when heavy hospital beds and medical machinery are installed.

 

In addition, issues such as bunching around the pillars, which were not a problem for the mall when specified, became a problem when the loads increased. This demanded a specific uprating solution.

 

The project used different external PT according to the condition of the floor slabs. External PT was used to prevent and mitigate the floor slab deflection, enhancing load bearing capacity.

 

For the full story, download your copy of 颁翱狈狈脝颁罢 edition 18 in PDF format and go to page 82:

 

/fileadmin/userdaten/CONNAECT/CONNAECT-2024.pdf

 

Contact us at our Zurich office for a printed copy.